A single element, examined properly, when the builder says it is fine.
An investigation measures the element against your engineering, AS 1684 for timber framing, AS 2870 for slabs and footings, AS 3700 for masonry, the National Construction Code and the Guide to Standards and Tolerances 2017.
0 checkpoints across 0 areas on a standard Catherine Field defect investigation report. We need the property accessible and, on a new build, the supervisor aware an independent inspector is attending. Whatever is blocked on the day is recorded as inaccessible, never as checked.
Measurable items from Leppington and Austral, each with a written requirement behind it.










New Construction Stage Inspections Seven checks through a Catherine Field build, hardware included.
Pre-Handover (PCI) Inspections Room by room, while your bargaining position holds.
Pre-Purchase Building Inspections A visual inspection under AS 4349.1, on mixed stock.
Building and Pest Inspections Both reports off one attendance, on largely recent housing. Instant online pricing, or talk to the booking team on 1300 471 805.
A stage visit covers everything visible at one point in a build. An investigation takes a single item and goes as deep as it needs to, because it is usually being written for a disagreement.
It is usually the first document in the file. NCAT generally wants an expert witness report drawn to its practice note, and we prepare those as separate work.
No. We set down the finding and the requirement it falls short of. Designing and certifying a structural remedy is an engineer's job and the report says when one is needed.