Slab pre-pour inspection in Catherine Field

Barrier, steel and set out, looked at before any of it is permanent.

  • The day before the pour, steel and formwork complete
  • About 1 hour on site
  • Report within 24 hours
Price your Catherine Field inspectionSend the address and where the build has got to.

Fully licensed & accredited

Stage2 of 7
When to bookThe day before the pour, steel and formwork complete
Time on siteAbout 1 hour on site
Inspected againstAS 2870, AS 3600, NCC Part 3.2, the engineer's slab design and the soil report

What is included in a Catherine Field slab pre-pour inspection

  • Slab class and layout checked against the engineer's design and the soil report
  • Edge beam and internal beam depths and widths
  • Reinforcement size, spacing, laps and trench mesh
  • Bar chairs, cover and support so steel does not sit on the ground
  • Waffle pods, void formers and pod spacing
  • Vapour barrier coverage, laps and tape at penetrations
  • Plumbing and electrical penetrations and sleeves
  • Set-downs for wet areas, garage, porch and alfresco
  • Termite management components installed before the pour
  • Formwork alignment, level and set-out against the plans
  • Stormwater pipe cover and pit positions where visible
  • Site cut, fill and pier holes where visible
  • Hot water service and meter box slab extensions formed
  • Trench cleanliness and debris before the pour
Why it matters here

Slab pre-pour inspections on Catherine Field builds

The slab carries the house, and its engineering lives in things that vanish under concrete: beam geometry, reinforcement, cover, the vapour barrier and the set downs. A shower recess set down that is wrong at the pour is a tiler's problem months later and an owner's problem for years after that. The photographs below were taken in Leppington, Oran Park or Austral, between two and eight kilometres from Catherine Field, and each caption names its suburb. We would rather tell you that than let another job pass as a local one.

What we find at this stage in Catherine Field

  • Vapour barrier interrupted beneath the slab
  • Cover to reinforcement under the minimum
  • Beam geometry not agreeing with the engineering
  • Shower and wet area set downs not formed
  • Penetrations set out in the wrong places
Grading required around the slab, Austral, Catherine Field
Grading required around the slab, Austral
Sample findings

Sample defects found during our slab pre-pour inspections in Catherine Field

Annotated findings from Slab pre-pour inspections on Catherine Field builds. Client addresses withheld.

Shower area, recorded at a lock-up inspection in Austral
Shower recess recorded, Austral
Bottom plate tie down at 600mm spacing, recorded at a frame inspection in Austral
Tie down spacing at the bottom plate, Austral
Bottom plate overhang of 25mm, recorded at a frame inspection in Leppington
Plate overhanging its slab edge, Leppington
Bottom plate tie down at 1200mm maximum spacing, recorded at a frame inspection in Oran Park
Tie down at 1200mm maximum spacing, Oran Park

The other stages of a Catherine Field build

  1. Bored piers inspection in Catherine Field1Bored piersAfter boring and cage placement, before concrete
  2. Frame inspection in Catherine Field3FrameOnce frame and trusses are up and the roof is on, before lining
  3. Lock-up (pre-plaster) inspection in Catherine Field4Lock-up (pre-plaster)After roof, cladding and external doors, before plaster
  4. Fixing inspection in Catherine Field5FixingAfter mouldings, doors and joinery, before the painter
  5. Waterproofing inspection in Catherine Field6WaterproofingAfter the membrane is applied and before any tile is laid
  6. Pre-handover (PCI) inspection in Catherine Field7Pre-handover (PCI)Two to three weeks before your handover date

All construction stage inspections in Catherine Field →

Guides

Construction stage guides for Catherine Field

All guides →

Book a slab pre-pour inspection in Catherine Field

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Slab pre-pour inspections in Catherine Field: common questions

Why does the set down matter so much?

A wet area floor has to fall to its waste, and the fall starts with the concrete. Get the set down wrong and the tiler is left building a slope out of adhesive, which is where flat spots and ponding water come from.

Can any of this be checked afterwards?

Only what is on the surface. Everything beneath the slab stops being verifiable the second the concrete is placed.

What if the concrete gets pushed back a week?

We simply attend on the new date and charge nothing more.

How long is the visit?

An hour to ninety minutes on a standard lot, with the report out that evening because the truck comes in the morning.

Do you look at penetrations?

Yes. Moving a waste before the pour costs minutes; moving it afterwards means cutting concrete.

What should I send across?

The engineering for the lot, along with the soil report behind it.